The Finish Line
We can see the end in sight. There is much to be accomplished but when we turned the page to December we were able to say ‘we are moving next month’. And right after that, we were informed of a one week delay! Still, the details are coming together.
We can see the end in sight. There is much to be accomplished but when we turned the page to December we were able to say ‘we are moving next month’. And right after that, we were informed of a one week delay! Still, the details are coming together.
The paint is complete. All of the colors were what we were hoping to see when we stared so intently at those paint swatches.
The culvert under the driveway had to be replaced due to a change in city code. That delayed the pouring of the driveway, sidewalks and patio extension. We are hoping to see cement today. The brick hearth is done. It came out well and really has a pretty shape to it.
The culvert under the driveway had to be replaced due to a change in city code. That delayed the pouring of the driveway, sidewalks and patio extension. We are hoping to see cement today. The brick hearth is done. It came out well and really has a pretty shape to it.
The tile is moving along. We are very pleased with all of the choices.
We had a meeting to discuss the placement of the entryway tile & accompanying listello (mosaic) iles. The end result is a perfect solution to a tile we knew we wanted to use as soon as we saw it at the tile store. We just weren't sure what the end result would look like at the time.
The hall bath or ‘pool bath’ as the plans call it (although we have no pool and the bathroom has a stand up shower and no bath tub) is gorgeous.
The granite countertops in the kitchen were installed. The granite, as we thought is really beautiful. Big chunks of silver and cobalt blue are very apparent in the black granite.
The master bath slate (with a familiar face visiting) ……is one of those ‘out of the box’ choices that turned out to be a good choice.
The Rainbow Rock shower floor – yes, a rock floor in the shower looks really cool – can’t wait to step on it. Picture to follow.
Carpet has been chosen for the guest rooms and closets. The retaining walls should be started next week. Tile will finish early next week. After that, electricians, plumbers & lighting are up to do their thing.
Our time line indicates a move in date of January 16 – that will be here before we know it. We are really getting excited!
No comments:
Post a Comment